Requiem for a Dream (2000)

CrimeDrama

The hopes and dreams of four ambitious people are shattered when their drug addictions begin spiraling out of control. A look into addiction and how it overcomes the mind and body.

Requiem for a Dream LetMeWatchThis
LetMeWatchThis Score: 8/10 from 4043 votes
Release Date: 2000-10-06
Status: Released
Run time: 102 min / 1:42
Production Studio : Artisan Entertainment
Production Country: United States of America

Casts

Ellen Burstyn
as Sara Goldfarb
Jared Leto
as Harry Goldfarb
Jennifer Connelly
as Marion Silver
Marlon Wayans
as Tyrone C. Love
Christopher McDonald
as Tappy Tibbons
Louise Lasser
as Ada
Marcia Jean Kurtz
as Rae
Janet Sarno
as Mrs. Pearlman
Suzanne Shepherd
as Mrs. Scarlini
Joanne Gordon
as Mrs. Ovadia
Charlotte Aronofsky
as Mrs. Miles
Mark Margolis
as Mr. Rabinowitz
Michael Kaycheck
as Donut Cop
Peter Maloney
as Dr. Pill
Denise Dowse
as Tyrone's Mother
Olga Merediz
as Malin & Block Secretary
Ben Shenkman
as Dr. Spencer
Keith David
as Big Tim
Dylan Baker
as Southern Doctor
Bill Buell
as Court Doctor
Lianna Pai
as Angelic Nurse
Stanley B. Herman
as Uncle Hank
Gregg Bello
as E.R. Doctor
Shaun O'Hagan
as Ward Attendant Seto
Jimmie Ray Weeks
as Prison Guard
Jack O'Connell
as Corn Dog Stand Boss
Chas Mastin
as Lyle Russel
Ajay Naidu
as Mailman
Sean Gullette
as Arnold the Shrink
Samia Shoaib
as Nurse Mall
Abraham Abraham
as King Neptune
Aliya Campbell
as Alice
Te'ron A. O'Neal
as Young Tyrone
Bryan Chattoo
as Brody
Eddie De Harp
as Brody's Henchman Victor
Scott Franklin
as Voice of Jailer (voice)
Peter Cheyenne
as Sal the Geep
Brian Costello
as First AD
Abraham Aronofsky
as Newspaper Man on Train
James Chinlund
as Space Oddity
Allison Furman
as Malin & Block Office Woman
Robert Dylan Cohen
as Paramedic Greenhill
Leland Gantt
as Ward Attendant Penn
Henry Stram
as ECT Technician
Hubert Selby Jr.
as Laughing Guard
Heather Litteer
as Big Tim Party Girl
Jenny Decker
as Big Tim Party Girl
Ami Goodheart
as Big Tim Party Girl
Nina Zavarin
as Big Tim Party Girl
Scott Bader
as Party Animal
Jim Centofanti
as Party Animal
Scott Chait
as Party Animal
Daniel Clarin
as Party Animal
Ben Cohen
as Party Animal
Eric Cohen
as Party Animal
Brett Feinstein
as Party Animal
Ricky Fier
as Party Animal
John Getz
as Party Animal
Andrew Kessler
as Party Animal
Ross Lombardo
as Party Animal
Carter Mansbach
as Party Animal
Scott Miller
as Party Animal
Todd Miller
as Party Animal
Joshua Pollack
as Party Animal
Craig Rallo
as Party Animal
Geordan Reisner
as Party Animal
Keith Scandore
as Party Animal
David Seltzer
as Party Animal
Chris Varvaro
as Party Animal
Ricardo ViƱas
as Party Animal
Chad Weiner
as Party Animal
Jesse Weissberger
as Party Animal
Greg Weissman
as Party Animal
Darren Aronofsky
as Visitor (uncredited)

Crew

Directing Darren Aronofsky Director
Writing Hubert Selby Jr. Screenplay
Writing Darren Aronofsky Screenplay
Production Palmer West Producer
Production Eric Watson Producer
Production Nick Wechsler Executive Producer
Production Stefan Simchowitz Executive Producer
Production Ann Ruark Line Producer
Production Beau Flynn Executive Producer
Sound Clint Mansell Original Music Composer
Camera Matthew Libatique Director of Photography
Editing Jay Rabinowitz Editor
Production Ann Goulder Casting
Production Anne McCarthy Casting
Production Mary Vernieu Casting
Art James Chinlund Production Design
Art Judy Rhee Art Direction
Art Ondine Karady Set Decoration
Costume & Make-Up Carolyn Grifel Costume Design
Costume & Make-Up Laura Jean Shannon Costume Design
Production Lori Keith Douglas Unit Production Manager
Crew Douglas Wilkinson Post Production Supervisor
Sound Stephen Barden Sound Designer
Sound Brian Emrich Sound Designer
Writing Hubert Selby Jr. Novel