The Nun (2018)

HorrorMysteryThriller

When a young nun at a cloistered abbey in Romania takes her own life, a priest with a haunted past and a novitiate on the threshold of her final vows are sent by the Vatican to investigate. Together they uncover the order’s unholy secret. Risking not only their lives but their faith and their very souls, they confront a malevolent force in the form of the same demonic nun that first terrorized audiences in “The Conjuring 2,” as the abbey becomes a horrific battleground between the living and the damned.

The Nun LetMeWatchThis
LetMeWatchThis Score: 5.8/10 from 1112 votes
Release Date: 2018-09-05
Status: Released
Run time: 96 min / 1:36
Production Studio : New Line Cinema, Atomic Monster, The Safran Company
Production Country: United States of America

Casts

Bonnie Aarons
as The Nun / Valak
Taissa Farmiga
as Sister Irene
Demián Bichir
as Father Burke
Jonas Bloquet
as Maurice "Frenchie" Theriault
Charlotte Hope
as Sister Victoria
Ingrid Bisu
as Sister Oana
Jonny Coyne
as Gregoro
Jared Morgan
as Marquis
Sandra Teles
as Sister Ruth
Boiangiu Alma
as Demon Nun
August Maturo
as Daniel
Michael Smiley
as Father Pasquale
Patrick Wilson
as Ed Warren (archive footage)
Vera Farmiga
as Lorraine Warren (archive footage)
Lili Taylor
as Carolyn Perron (archive footage)
Christof Veillon
as Older Maurice Theriault (archive footage)
Dee Bradley Baker
as Demonic Voice
Debra Wilson
as Demonic Voice
Mark Steger
as Duke
Lidiya Korotko
as Barmaid
Gabrielle Downey
as The Abbess
David Horovitch
as Cardinal Conroy
Tudor Munteanu
as Grigore
Lili Bordán
as Waitress Marta
Manuela Ciucur
as Sister Christine
Emma Appleton
as Elena
Daniel Mandehr
as Farmer Jozef
Jamie Muscato
as Father Patino

Crew

Directing Corin Hardy Director
Writing Gary Dauberman Screenplay
Production James Wan Producer
Production Peter Safran Producer
Camera Maxime Alexandre Director of Photography
Writing James Wan Story
Sound Abel Korzeniowski Music
Editing Michel Aller Editor
Art Jennifer Spence Production Design
Art Gina Calin Set Decoration
Costume & Make-Up Sharon Gilham Costume Design
Production Walter Hamada Executive Producer
Writing Gary Dauberman Story
Editing Ken Blackwell Editor
Production Rich Delia Casting
Production Liliana Toma Casting
Production Rose Wicksteed Casting
Art Adrian Curelea Art Direction
Art Vraciu Eduard Daniel Art Direction
Costume & Make-Up Domnica Bodogan Hairstylist
Costume & Make-Up Adelina Handuri Key Hair Stylist
Costume & Make-Up Iulia Roseanu Key Makeup Artist
Costume & Make-Up Eleanor Sabaduquia Makeup Department Head
Costume & Make-Up Jeremy Bramer Makeup Artist
Costume & Make-Up Mara Rouse Makeup Artist
Art Alina Petrini Art Department Coordinator
Art Carol Kiefer Art Department Coordinator
Art Diana Ghinea Assistant Art Director
Art Maggie Mannion Assistant Property Master
Crew John F. Soria Carpenter
Art Ken Barthelmey Concept Artist
Art Eusebiu Sirbu Graphic Designer
Art Clint Schultz Graphic Designer
Art Jessica McDonald Greensman
Art Charlie Jaramillo Greensman
Art Adi Handac Property Master
Art Sean Mannion Property Master
Art Dinica Tiberiu Props
Art Daniela Medeiros Set Designer
Art Martin L. Mercer Storyboard Artist
Camera Cory Geryak Additional Director of Photography
Camera Moldoveanu Constantin Assistant Camera
Camera George Budescu Assistant Camera
Camera Valentin Mircea Camera Operator
Camera BJ McDonnell Camera Operator
Camera Craig Bauer Additional Photography
Camera Erdem Ertal Additional Photography
Camera Camilla Carniello Camera Trainee
Camera Ioana Florescu Digital Imaging Technician
Camera Mihai Cosmin Popa Digital Imaging Technician
Camera Jason Bauer Digital Imaging Technician
Camera Dane Brehm Digital Imaging Technician
Camera Marco Fabriziani Drone Pilot
Lighting Catalin Chiorean Electrician
Lighting Catalin Ciobanu Electrician
Lighting Marcu Ion Electrician
Lighting Mihai Adrian Olteanu Electrician
Lighting Liviu Popa Electrician
Camera Andrei Cretan First Assistant "A" Camera
Camera Petre Victor First Assistant "B" Camera
Camera Josh Greer First Assistant "B" Camera
Lighting Florin Niculae Gaffer
Lighting John Gorman Gaffer
Lighting Nicholas Kaat Gaffer
Camera Sarbu Gigi Grip
Camera Alexandru Bogdan Stefan Grip
Camera Radu Marinescu Key Grip
Camera Joe Macaluso Key Grip