Passing Strange (2009)

DramaMusic

A young black artist leaves his Los Angeles digs and travels to Europe to find himself. A theatrical stage production of the original Broadway musical

Passing Strange LetMeWatchThis
LetMeWatchThis Score: 6.8/10 from 6 votes
Release Date: 2009-08-21
Status: Released
Run time: 135 min / 2:15
Production Studio : 40 Acres & A Mule Filmworks, Apple Core Holdings, Shubert Organization
Production Country: United States of America

Casts

De'Adre Aziza
as Edwina / Marianna / Sudabey
Daniel Breaker
as Youth
Eisa Davis
as Mother
Colman Domingo
as Mr.Franklin / Joop / Mr. Venus
Chad Goodridge
as Rev. Jones / Terry / Christophe / Hugo
Rebecca Naomi Jones
as Sherry / Renata / Desi

Crew

Production Butch Robinson Line Producer
Editing Barry Alexander Brown Editor
Art Barry Alexander Brown Production Design
Directing Spike Lee Director
Production Steve Klein Producer
Camera Matthew Libatique Director of Photography
Writing Stew Writer