Josie and the Pussycats (2001)

ComedyMusic

Josie, Melody and Val are three small-town girl musicians determined to take their rock band out of their garage and straight to the top, while remaining true to their look, style and sound. They get a record deal which brings fame and fortune but soon realize they are pawns of two people who want to control the youth of America. They must clear their names, even if it means losing fame and fortune.

Josie and the Pussycats LetMeWatchThis
LetMeWatchThis Score: 5.4/10 from 115 votes
Release Date: 2001-04-06
Status: Released
Run time: 98 min / 1:38
Production Studio : Marc Platt Productions, Universal Pictures, Riverdale Productions, Metro-Goldwyn-Mayer
Production Countries: Canada, United States of America

Casts

Rachael Leigh Cook
as Josie McCoy
Rosario Dawson
as Valerie Brown
Tara Reid
as Melody Valentine
Alan Cumming
as Wyatt Frame
Parker Posey
as Fiona
Gabriel Mann
as Alan M.
Paulo Costanzo
as Alexander Cabot
Missi Pyle
as Alexandra Cabot
Alexander Martin
as Les - Du Jour (uncredited)
Donald Faison
as D.J. - Du Jour (uncredited)
Seth Green
as Travis - Du Jour (uncredited)
Breckin Meyer
as Marco - Du Jour (uncredited)
JR Bourne
as Shop Owner

Crew

Directing Harry Elfont Director
Directing Deborah Kaplan Director
Writing Deborah Kaplan Writer
Writing Harry Elfont Writer
Camera Shane Harvey Still Photographer
Camera David Cooper Still Photographer
Camera Matthew Libatique Director of Photography
Sound John Frizzell Original Music Composer
Editing Peter Teschner Editor
Production Joseph Middleton Casting
Costume & Make-Up Sanna Seppanen Key Hair Stylist
Directing Jessica Clothier Script Supervisor
Sound Tracey Edmonds Music Supervisor
Sound Michael McQuarn Music Supervisor
Art Jasna Stefanovic Production Design
Art Johanne Hubert Set Decoration
Costume & Make-Up Leesa Evans Costume Design
Camera John Clothier Camera Operator
Costume & Make-Up Michelle Hunter Costume Supervisor
Production Marc Platt Producer
Sound Angie Rubin Music Editor
Sound Carin Rogers Dialogue Editor
Sound Richard Corwin Dialogue Editor
Sound John H. Arrufat Dialogue Editor
Sound Joe Schiff ADR Editor
Sound Renée Tondelli ADR Supervisor
Art James H. Chow Property Master
Sound Sarah Monat Foley Artist
Sound Vince Nicastro Foley Artist
Sound Thomas W. Small Foley Supervisor
Sound Randy Singer Foley Mixer
Sound Scott Curtis Foley Editor
Sound Jeanette Browning ADR Recordist
Sound Alex Raspa ADR Recordist
Sound Philip Rogers ADR Recordist
Sound Paul N.J. Ottosson Sound Effects Editor
Sound Paul N.J. Ottosson Sound Designer
Sound Doug Jackson Sound Effects Editor
Sound Stephen Neary Sound Recordist
Sound Rick Kline Sound Re-Recording Mixer
Sound Chris Carpenter Sound Re-Recording Mixer
Crew Mike Vézina Stunt Coordinator