Phone Booth (2002)

ThrillerDrama

A slick New York publicist who picks up a ringing receiver in a phone booth is told that if he hangs up, he'll be killed... and the little red light from a laser rifle sight is proof that the caller isn't kidding.

Phone Booth LetMeWatchThis
LetMeWatchThis Score: 6.8/10 from 1614 votes
Release Date: 2002-09-09
Status: Released
Run time: 81 min / 1:21
Production Studio : Fox 2000 Pictures
Production Country: United States of America

Casts

Colin Farrell
as Stu Shepard
Kiefer Sutherland
as The Caller
Forest Whitaker
as Captain Ramey
Radha Mitchell
as Kelly Shepard
Katie Holmes
as Pamela McFadden
Paula Jai Parker
as Felicia
Arian Waring Ash
as Corky
Tia Texada
as Asia
John Enos III
as Leon
Richard T. Jones
as Sergeant Cole
Keith Nobbs
as Adam
Dell Yount
as Pizza Guy
James MacDonald
as Negotiator
Josh Pais
as Mario
Yorgo Constantine
as ESU Commander
Colin Patrick Lynch
as ESU Technician
Troy Gilbert
as ESU Sniper
Seth William Meier
as Officer McDuff
Svetlana Efremova
as Erica
Billy Erb
as Lars
Domenick Lombardozzi
as Wyatt
Maile Flanagan
as Lana
Tom Reynolds
as Richard
Ben Foster
as Big Q (uncredited)
Jared Leto
as Bobby (uncredited)

Crew

Directing Joel Schumacher Director
Writing Larry Cohen Screenplay
Production David Zucker Producer
Camera Matthew Libatique Director of Photography
Editing Mark Stevens Editor
Art Andrew Laws Production Design
Production Mali Finn Casting
Camera Christine M. Loss Still Photographer
Art Martin Whist Art Direction
Sound Harry Gregson-Williams Original Music Composer
Costume & Make-Up Daniel Orlandi Costume Design
Directing Sharron Reynolds Script Supervisor