Justice League (2017)

ActionAdventureFantasyScience Fiction

Fuelled by his restored faith in humanity and inspired by Superman's selfless act, Bruce Wayne and Diana Prince assemble a team of metahumans consisting of Barry Allen, Arthur Curry and Victor Stone to face the catastrophic threat of Steppenwolf and the Parademons who are on the hunt for three Mother Boxes on Earth.

Justice League LetMeWatchThis
LetMeWatchThis Score: 6.3/10 from 5862 votes
Release Date: 2017-11-15
Status: Released
Run time: 120 min / 2:0
Production Studio : DC Comics, DC Entertainment, RatPac-Dune Entertainment, Warner Bros. Pictures, Cruel & Unusual Films, Atlas Entertainment, Lensbern Productions
Production Country: United States of America

Casts

Ben Affleck
as Bruce Wayne / Batman
Henry Cavill
as Clark Kent / Superman / Kal-El
Gal Gadot
as Diana Prince / Wonder Woman
Ezra Miller
as Barry Allen / Flash
Jason Momoa
as Arthur Curry / Aquaman
Ray Fisher
as Victor Stone / Cyborg
Ciarán Hinds
as Steppenwolf (voice)
Amy Adams
as Lois Lane
Jeremy Irons
as Alfred Pennyworth
Diane Lane
as Martha Kent
Connie Nielsen
as Queen Hippolyta
J.K. Simmons
as Commissioner James Gordon
Billy Crudup
as Henry Allen (uncredited)
Joe Morton
as Silas Stone
Amber Heard
as Mera
Michael McElhatton
as Black Clad Alpha
Joe Manganiello
as Slade Wilson / Deathstroke (uncredited)
Jesse Eisenberg
as Lex Luthor (uncredited)
Robin Wright
as Antiope (uncredited)
David Thewlis
as Ares
Julian Lewis Jones
as King Atlan
Marc McClure
as Officer Ben Sadowsky
Lisa Loven Kongsli
as Menalippe
Holt McCallany
as Burglar
Ingvar Eggert Sigurðsson
as Mayor (as Ingvar Sigurdsson)
Gemma Refoufi
as Lex Luthor's Guard
Kelly Burke
as Air Force Security Officer
Paulina Boneva
as Paramedic Gotham City Hospital
Alexandra Ford
as Front Row Football Fan
Eleanor Matsuura
as Epione
Daniel Stisen
as Ancient Warrior
Samantha Jo
as Euboea
Sergi Constance
as Zeus
Doutzen Kroes
as Venelia
Dan Mersh
as Art Thief
Peter Vo
as Citizen in Bank (uncredited)

Crew

Writing Chris Terrio Writer
Production Deborah Snyder Producer
Production Charles Roven Producer
Editing David Brenner Editor
Camera Fabian Wagner Director of Photography
Writing Bill Finger Characters
Writing Bob Kane Characters
Writing Jerry Siegel Characters
Writing Joe Shuster Characters
Production Ben Affleck Executive Producer
Production Jon Berg Producer
Production Wesley Coller Executive Producer
Production Finni Johannsson Line Producer
Production Chris Terrio Executive Producer
Production Gregory Wilson Co-Producer
Production Kristy Carlson Casting
Production Lora Kennedy Casting
Art Patrick Tatopoulos Production Design
Costume & Make-Up Michael Wilkinson Costume Design
Costume & Make-Up Emmy Beech Makeup Artist
Writing Zack Snyder Story
Writing Chris Terrio Story
Production Christopher Nolan Executive Producer
Production Geoff Johns Producer
Production Daniel S. Kaminsky Executive Producer
Production Curt Kanemoto Executive Producer
Production Benjamin Melniker Executive Producer
Production Jim Rowe Executive Producer
Production Michael E. Uslan Executive Producer
Production Emma Thomas Executive Producer
Production Marianne Jenkins Co-Producer
Production Andrea Wertheim Associate Producer
Editing Richard Pearson Editor
Editing Martin Walsh Editor
Production Kate Ringsell Casting
Art Dominic Capon Set Decoration
Art Lorin Flemming Art Direction
Art Joseph Hiura Art Direction
Art Paul Laugier Art Direction
Directing Zack Snyder Director
Writing Joss Whedon Screenplay
Art Rick Newsome Storyboard Designer
Art Samuel Leake Art Direction
Art Keith Pain Art Direction
Art Andrew Palmer Art Direction
Art Hayley Easton Street Art Direction
Art Helen Xenopoulos Art Direction
Art Christian Huband Supervising Art Director
Art Helen Jarvis Supervising Art Director
Costume & Make-Up Graham Johnston Hair Department Head
Costume & Make-Up Zoe Tahir Hair Department Head
Costume & Make-Up Kristin Wahl Hair Designer
Costume & Make-Up Emmy Beech Hairstylist
Costume & Make-Up Dorey Cilia Hairstylist
Costume & Make-Up Sarah Grispo Hairstylist
Costume & Make-Up Sarah Hamilton Hairstylist
Costume & Make-Up Gabor Kerekes Hairstylist
Costume & Make-Up Sallie Jaye Hairstylist
Costume & Make-Up Carmel Jackson Hair Supervisor
Costume & Make-Up Karen Cohen Hair Supervisor
Costume & Make-Up Julie Dartnell Key Hair Stylist
Costume & Make-Up Graham Johnston Makeup Department Head
Costume & Make-Up Zoe Tahir Makeup Department Head
Costume & Make-Up Dorey Cilia Makeup Artist
Costume & Make-Up Sarah Grispo Makeup Artist
Costume & Make-Up Sarah Hamilton Makeup Artist
Costume & Make-Up Gabor Kerekes Makeup Artist
Costume & Make-Up Victoria Down Makeup Designer
Costume & Make-Up Kate Biscoe Makeup Designer
Costume & Make-Up Carmel Jackson Makeup Supervisor
Costume & Make-Up Karen Cohen Makeup Supervisor
Costume & Make-Up Stephen Murphy Prosthetic Makeup Artist
Art Sophie Worley Art Department Coordinator
Art Sophie Bridgman Assistant Art Director
Art Julia Dehoff Assistant Art Director
Art Daniel Nussbaumer Assistant Art Director
Art Emma Clough Draughtsman
Art Alfredo Lupo Draughtsman
Art Dorrie Young Draughtsman
Art Ben Wilkinson Property Master
Art Anshuman Prasad Set Designer
Art Haukur M. Hrafnsson Set Dresser
Art Daniel Newton Set Dresser
Art Josh Sales Set Dresser
Art Rafael Somarriba Set Dresser
Production Caitlin McKenna-Wilkinson ADR Voice Casting
Production Jeanette Benzie Casting Associate
Production Catriona Dickie Casting Assistant
Production Leigh Ann Smith Casting Assistant
Crew Marc Wolff Aerial Coordinator
Crew Lucia Foster Found Aerial Coordinator
Crew Charles Bodycomb Armorer
Crew Miles A. Fletcher Pilot
Crew Daren Bailey Marine Coordinator
Directing Jesse Peckham Script Coordinator
Directing Kimi Webber Script Supervisor
Crew Lee Anne Muldoon Unit Publicist
Camera Eric Dvorsky Aerial Camera Technician
Camera Will Handley Aerial Camera Technician
Camera Adam Dale Aerial Director of Photography
Camera Kris Krosskove Camera Operator
Camera John Gamble Camera Operator
Camera Jean-Philippe Gossart Second Unit Director of Photography
Camera Jeremy Hiles Camera Operator
Camera Stefan Stankowski Additional Photography
Crew Alan Perrin Drone Operator
Lighting Chuck Finch Gaffer
Lighting Wick Finch Gaffer
Lighting Christopher Prampin Gaffer
Lighting Dan Jones Gaffer
Camera Steve Ellingworth Key Grip
Camera Arnar Einarsson Key Grip
Camera Joe Macaluso Key Grip
Lighting Ricky Collins Lighting Technician
Lighting David Cormack Lighting Technician
Lighting Aaron Dunning Lighting Technician
Lighting Scott Parker Lighting Technician
Lighting Jack Ridout Lighting Technician
Lighting Greg Etheredge Lighting Technician
Lighting Genki McClure Lighting Technician
Lighting Gary Nolan Rigging Gaffer
Lighting Jason C. Fitzgerald Rigging Gaffer
Lighting Jack Serino Rigging Grip
Camera Jonathan Prime Still Photographer
Visual Effects Matt Dicken 3D Artist
Visual Effects Jan Fischer 3D Artist
Visual Effects Philipp Röger 3D Artist
Visual Effects Brian Runnels 3D Coordinator
Visual Effects Yordan Petrov 3D Generalist
Visual Effects Daryl Sawchuk Animation Supervisor
Visual Effects Omar Morsy Animation Supervisor
Visual Effects Eric Petey Animation Supervisor
Visual Effects Clement Yip Animation Supervisor
Visual Effects David Crispino Animation Supervisor
Visual Effects Matthieu Poirey Animation Supervisor
Crew Eric Schoellnast CG Supervisor
Crew Francois Sugny CG Supervisor
Crew Alexander Seaman CG Supervisor
Crew Sebastien Francoeur CG Supervisor
Crew Chris Mulcaster CG Supervisor
Crew Randy Ui CG Supervisor
Crew Ronnie Menahem CG Supervisor
Crew Daniele Tosti CG Supervisor
Visual Effects Tonio Freitag 3D Artist
Visual Effects Christophe St-Pierre Paradis Lead Animator
Visual Effects Elaine Wu Lead Animator
Visual Effects Kevin Kohri Lead Animator
Visual Effects Daniel Lorenzo Alvarez Lead Animator
Visual Effects Bill Bridges Lead Animator
Visual Effects Ken Satchel King Lead Animator
Lighting Dalmas Rémy Lighting Supervisor
Visual Effects Rosie Draper Matchmove Supervisor
Visual Effects Simon Pynn Matchmove Supervisor
Visual Effects Etienne Poulin St-Laurent Matchmove Supervisor
Visual Effects Steve Yamamoto Pre-Visualization Supervisor
Visual Effects Draghici Bogdan 3D Generalist
Visual Effects Farid K. Yazami 3D Generalist
Crew Giacomo Mineo Sequence Supervisor
Crew Ben Cowell-Thomas Sequence Supervisor
Visual Effects Lei Zhang VFX Editor
Visual Effects Barbara Holmes VFX Editor
Visual Effects Liana Jackson VFX Editor
Visual Effects Martin November VFX Editor
Visual Effects Ilkka Uitto VFX Editor
Visual Effects Goldie Hanger VFX Production Coordinator
Visual Effects Joyce Au Visual Effects Coordinator
Visual Effects Alex Belgeonne Visual Effects Coordinator
Visual Effects Jessica Carrington Visual Effects Coordinator
Visual Effects Adrianna Nielle Davies Visual Effects Coordinator
Visual Effects Kate Elum Visual Effects Coordinator
Visual Effects Chloe Feodoroff Visual Effects Coordinator
Visual Effects Arushi Govil Visual Effects Coordinator
Visual Effects Edan Hopper Visual Effects Coordinator
Visual Effects Kimberly Julien Visual Effects Coordinator
Visual Effects Stewart Kojima Visual Effects Coordinator
Visual Effects Naveen Kumar Visual Effects Coordinator
Visual Effects Ilse Martinez Visual Effects Coordinator
Visual Effects Emily C. Moye Visual Effects Coordinator
Visual Effects Bonita Nichols Visual Effects Coordinator
Visual Effects Carine Ong Visual Effects Coordinator
Visual Effects Emily Pead Visual Effects Coordinator
Visual Effects Marshall Rainey Visual Effects Coordinator
Visual Effects Sahil.Wadhwani Visual Effects Coordinator
Visual Effects Magali Signourel Visual Effects Coordinator
Visual Effects Krzysztof Szulc Visual Effects Coordinator
Visual Effects Ben Wardle Visual Effects Coordinator
Visual Effects Robin Williams Visual Effects Coordinator
Visual Effects Paige Andrews Visual Effects Coordinator
Visual Effects Laura McGlynn Visual Effects Coordinator
Visual Effects Megan Wong Visual Effects Coordinator
Visual Effects Kathrin Lang Visual Effects Coordinator
Visual Effects Sara Bourque Visual Effects Coordinator
Visual Effects Lorie Bussières Visual Effects Coordinator
Visual Effects Jade Ghali-Lachapelle Visual Effects Coordinator
Visual Effects Mary Hayden Visual Effects Coordinator
Visual Effects Gretel Ng Visual Effects Coordinator
Visual Effects Rocco Pierini Visual Effects Coordinator
Crew Brad Minnich Visual Effects Editor
Crew James Mann Visual Effects Editor
Crew Kelly Noordermeer Visual Effects Editor
Crew René Mertens Visual Effects Editor
Crew Timur Yesilfiliz Visual Effects Editor
Crew Mathieu Chouinard Visual Effects Editor
Crew Guillaume Poulin Visual Effects Editor
Crew Jonathan D. Martin Visual Effects Editor
Visual Effects Josh R. Jaggars Visual Effects Producer
Visual Effects Amit Jhamb Visual Effects Producer
Visual Effects Rebecca West Visual Effects Producer
Visual Effects Steve Griffith Visual Effects Producer
Visual Effects Sebastian Meszmann Visual Effects Producer
Visual Effects Mona Mohr Visual Effects Producer
Visual Effects Marie-Cecile Dahan Visual Effects Producer
Visual Effects Molly Pabian Visual Effects Producer
Visual Effects Richard Ivan Mann Visual Effects Producer
Visual Effects Lena Scanlan Visual Effects Producer
Visual Effects Sean Konrad Visual Effects Supervisor
Visual Effects Seth Maury Visual Effects Supervisor
Visual Effects Loeng Wong-Savun Visual Effects Supervisor
Visual Effects Thomas Proctor Visual Effects Supervisor
Visual Effects Thilo Ewers Visual Effects Supervisor
Visual Effects Sven Martin Visual Effects Supervisor
Visual Effects Peter Nofz Visual Effects Supervisor
Visual Effects Bryan Hirota Visual Effects Supervisor
Visual Effects Julie Orosz Visual Effects Supervisor
Visual Effects David Wallace Allen Visual Effects Supervisor
Visual Effects Keith Miller Visual Effects Supervisor
Visual Effects Chia-Chun Lin Visual Effects Technical Director
Visual Effects Carlos Guzman Visual Effects Technical Director
Visual Effects Stefanos Kittakis Visual Effects Technical Director
Visual Effects Mark Cameron Williams Visual Effects Technical Director
Editing Romana Cicova Assistant Editor
Editing Britni Ziegler Peters Assistant Editor
Editing Damian F. Gomez Assistant Editor
Editing Ian Sullivan Digital Intermediate
Editing Giovanni DiGiorgio Digital Intermediate
Editing Stefan Sonnenfeld Digital Intermediate
Editing Matthew W. Johnson Digital Intermediate
Editing Annie Johnson Digital Intermediate
Editing Carlos M. Castillón First Assistant Editor
Editing Kevin Hickman First Assistant Editor
Editing Warren Paeff First Assistant Editor
Editing Peter Tackaberry First Assistant Editor
Sound Michelle Pazer ADR Editor
Sound Chris Murphy Boom Operator
Sound Tom Caton Boom Operator
Sound Margit Pfeiffer Dialogue Editor
Sound Michelle Pazer Dialogue Editor
Sound Michael J. Broomberg Foley
Sound Roy Seeger First Assistant Sound Editor
Sound Gavin Marshall First Assistant Sound Editor
Sound Hugh Sherlock First Assistant Sound Editor
Sound Chuck Michael Sound Designer
Sound Phil Barrie Sound Effects Designer
Sound Eliot Connors Sound Effects Designer
Sound Casey Genton Sound Effects Designer
Sound Ando Johnson Sound Effects Editor
Sound Bob Kellough Sound Effects Editor
Sound Chris Jenkins Sound Re-Recording Mixer
Sound Michael Keller Sound Re-Recording Mixer
Sound Lauren Hadaway Supervising ADR Editor
Sound Lauren Hadaway Supervising Dialogue Editor
Sound Scott Hecker Supervising Sound Editor
Sound Alex Gibson Music Editor
Sound Melissa Muik Music Editor
Sound Denise Okimoto Music Editor
Sound Jay B. Richardson Music Editor
Sound Karen Elliott Music Supervisor
Sound Lisa Jaime Supervising Music Editor
Costume & Make-Up Michael Mooney Assistant Costume Designer
Costume & Make-Up Amanda McLaughlan Costume Coordinator
Costume & Make-Up Claire Watson Costume Coordinator
Costume & Make-Up Brooke Dibble Costume Illustrator
Costume & Make-Up Ian Joyner Costume Illustrator
Costume & Make-Up Jerad Marantz Costume Illustrator
Costume & Make-Up Max Brennan Set Costumer
Costume & Make-Up Charles Gillies Set Costumer
Costume & Make-Up Perry Goyen Set Costumer
Costume & Make-Up Jessica Phillips Set Costumer
Costume & Make-Up Kelly Porter Set Costumer
Costume & Make-Up Kevin Pratten Wardrobe Supervisor
Visual Effects Mark Holt Special Effects Supervisor
Visual Effects Haukur Karlsson Special Effects Supervisor
Crew Lucy Myers Special Effects Coordinator
Crew Tim Rigby Stunts
Sound Danny Elfman Original Music Composer
Writing Jay Oliva Storyboard
Sound Robert Edwards ADR Mixer
Crew Robert Kanigher Thanks
Crew Curt Swan Thanks