Robert H. Russ


Production Credits

Inside Out (2015)
Fix Animator
Monsters University (2013)
Animation Director
Ratatouille (2007)
Animation
The Incredibles (2004)
Animation
Monsters, Inc. (2001)
Animation
Toy Story 2 (1999)
Animation