Teddy Newton

Place of birth:

Encino, California, USA:

Biography:

Teddy Newton is an artist at Pixar Animation Studios. He has worked as a storyboard artist for 2 Stupid Dogs, The Iron Giant, and Dexter's Laboratory. He studied at the California Institute of the Arts in its world-renowned Character Animation program. At Pixar, he also co-wrote the short film Jack-Jack Attack and did the voices of the newsreel narrator in The Incredibles, Skinner's lawyer in Ratatouille, the 'Steward' robots in Wall-E, a television commercial salesman in Up, and Chatter Telephone in Toy Story 3. He made his directorial debut with the Pixar short film Day & Night. Description above from the Wikipedia article Teddy Newton, licensed under CC-BY-SA, full list of contributors on Wikipedia .


Film Credits

Partysaurus Rex (2012)
as Additional Voices (voice)
Small Fry (2011)
as Mini Buzz Lightyear (voice)
Mater Private Eye (2010)
as
Moon Mater (2010)
as
Toy Story 3 (2010)
as Chatter Telephone (voice)
Up (2009)
as Additional Voices (voice)
Cars Toon Mater's Tall Tales (2008)
as Additional Voices
WALL·E (2008)
as Steward Bots (voice)
Ratatouille (2007)
as Lawyer (Talon Labarthe) (voice)
The Incredibles (2004)
as Newsreel Narrator (voice)
Boys Night Out (2003)
as

Production Credits

Day & Night (2010)
Director
Jack-Jack Attack (2005)
Story
The Incredibles (2004)
Character Designer
Boys Night Out (2003)
Art Direction
Boys Night Out (2003)
Director
Boys Night Out (2003)
Writer
The Trouble with Lou (2001)
Producer
The Trouble with Lou (2001)
Writer
The Iron Giant (1999)
Additional Storyboarding
The Iron Giant (1999)
Character Designer
The Iron Giant (1999)
Visual Development