Tim Simonec


Production Credits

Zootopia (2016)
Orchestrator
Inside Out (2015)
Orchestrator
John Carter (2012)
Orchestrator
Cars 2 (2011)
Conductor
Super 8 (2011)
Conductor
Up (2009)
Orchestrator
Ratatouille (2007)
Conductor
The Incredibles (2004)
Orchestrator
The Chronicles of Riddick (2004)
Orchestrator
Out of Time (2003)
Orchestrator
Freddy vs. Jason (2003)
Orchestrator
Red Planet (2000)
Orchestrator
A Rumor of Angels (2000)
Original Music Composer
Titan A.E. (2000)
Original Music Composer
Pitch Black (2000)
Orchestrator
The Siege (1998)
Orchestrator
Dennis the Menace Strikes Again! (1998)
Orchestrator
Suicide Kings (1998)
Original Music Composer
From Dusk Till Dawn (1996)
Orchestrator
Ghost in the Machine (1993)
Orchestrator
Hard Target (1993)
Original Music Composer