Tim Davies

Birthday:

01/01/1972

Place of birth:

Brisbane, Queensland, Australia:


Production Credits

Ant-Man and the Wasp (2018)
Conductor
Trolls Holiday (2017)
Conductor
Trolls Holiday (2017)
Orchestrator
Olaf's Frozen Adventure (2017)
Conductor
La La Land (2016)
Orchestrator
Trolls (2016)
Conductor
The Peanuts Movie (2015)
Conductor
The Peanuts Movie (2015)
Orchestrator
Ant-Man (2015)
Orchestrator
The Book of Life (2014)
Conductor
Edge of Tomorrow (2014)
Conductor
Endless Love (2014)
Conductor
Endless Love (2014)
Orchestrator
Frozen (2013)
Conductor
Frozen (2013)
Orchestrator
R.I.P.D. (2013)
Conductor
Despicable Me (2010)
Conductor