Kent Melton


Production Credits

Tangled (2010)
Visual Development
Coraline (2009)
Sculptor
The Incredibles (2004)
Sculptor
Atlantis: The Lost Empire (2001)
Sculptor
The Lion King (1994)
Sculptor