Stephen M. Davis


Production Credits

Incredibles 2 (2018)
Music Editor
Coco (2017)
Music Editor
Doctor Strange (2016)
Music Editor
Star Trek Beyond (2016)
Music Editor
Zootopia (2016)
Music Editor
Inside Out (2015)
Music Editor
John Carter (2012)
Music Editor
Prep & Landing: Naughty vs. Nice (2011)
Music Editor
50/50 (2011)
Music Editor
Cars 2 (2011)
Music Editor
La luna (2011)
Music Editor
Up (2009)
Music Editor
Partly Cloudy (2009)
Music Editor
Ratatouille (2007)
Music Editor
Mission: Impossible III (2006)
Music Editor
Sky High (2005)
Music Editor
The Incredibles (2004)
Music Editor