Mike Cachuela


Production Credits

The SpongeBob Movie: Sponge Out of Water (2015)
Storyboard
Coraline (2009)
Storyboard
Corpse Bride (2005)
Storyboard
The Life Aquatic with Steve Zissou (2004)
Editorial Manager
The Incredibles (2004)
Storyboard
Scooby-Doo (2002)
Art Department Manager
Scooby-Doo (2002)
Production Illustrator
Monkeybone (2001)
Conceptual Design
Monkeybone (2001)
Storyboard
Deuce Bigalow: Male Gigolo (1999)
Storyboard
Antz (1998)
Storyboard
James and the Giant Peach (1996)
Storyboard
The Nightmare Before Christmas (1993)
Storyboard
FernGully: The Last Rainforest (1992)
Animation